GGJIA / LIGHTING JOURNAL

How to Install G GJIA Permanent Outdoor Lights?

Published By ArlenConan Back to articles
G GJIA Permanent Outdoor Under Eave Lighting

Part 1. Materials Needed for Permanent Christmas Light Installation

Before setting up theG GJIA Permanent Outdoor Lights, you will need the following: a ladder, a drill, a measuring tape, a pencil, mounting clips or screws, and, of course, the G GJIA Eave light kit. The availability of such tools ensures the convenient and rapid installation.

G GJIA Permanent Outdoor Under Eave Christmas Lights Installation Preparation with Required Tools and Complete Light Kit

Part 2. How to Install G GJIA Permanent Outdoor Lights in 6 Steps

Pre‑Installation Preparation

Start by selecting the locations you want to illuminate, such as rooflines, patios, or fences. Ensure the surface is clean to ensure a safe stick or placement. Select the required length and have your power source ready. Then, recheck the layout one more time to ensure it is balanced and accessible, and place the real light there.

Installation video of Permanent Outdoor Lights:

Here is a step-by-step guide to help you install G GJIA RGCW permanent lights perfectly on your own.

GGJIA Permanent Outdoor Eave Lights 8-Step Easy Installation Infographic, Covering Surface Preparation, Fixture Mounting, Waterproof Connection and Driver Setup

Step 1: After opening the box, the first thing to do is test the lights. To do so, connect the strings and then connect them to a power source, examine whether they light up.

Step 1 Permanent Light Installation - Testing LED Light Strings by Connecting to Power Supply Before Mounting

Step 2. After cleaning the wall with a cloth or tissue, please place the string lights 3 to 8 cm from the wall surface. (Most people choose a distance of 5–10 cm.)

Step 2 Permanent Light Installation - Cleaning Eave Surface and Measuring 3-8cm Installation Distance for Light String Placement

Step 3: Hold the light firmly on the surface for at least five seconds after tearing the VHB gum from the rear of the light. To hold each string light in place, fasten it with four screw clips.

Step 3 Permanent Light Installation - Pressing Light String Firmly for Over 5 Seconds After Removing VHB Adhesive Backing

Step 4:Connect two string lights via water proof connectors and screw in the cap.

Step 4 Permanent Light Installation - Joining Two Light Strings with Waterproof Connectors and Tightening the End Cap

Step 5: Connect the LED driver module to the end of the string light, followed by the remaining string lights. To ensure every string light functions correctly, plug it into the power source now.

Step 5 Permanent Light Installation - Connecting LED Driver Module to Light String and Verifying Power Function

Step 6: Screw the last string’s light section waterproof connecting cap firmly in place.

Step 6 Permanent Light Installation - Securing Waterproof Connector Cap on the Final Light String Section

Find the right light for your space.

Explore GGJIA lighting, compare your options, and get help with your next project.

JOIN THE CONVERSATION

Leave a comment

Your email address will not be published. All fields are required.

Comments are reviewed before publication.

READER DISCUSSION

Discussion

No comments yet. Be the first to share your thoughts.