Case Study 1: Automotive Assembly Plant Efficiency Boost Location: Stuttgart, GermanyIndustry: Automotive ManufacturingChallenge: A major OEM faced frequent production delays due to uneven lighting in robotic welding zones, causing a 12% defect rate. Existing 400W metal halide fixtures also consumed 1.8M kWh annually.Solution: Deployed 180 units of G GJIA Supper Series 400W with asymmetric optics Installed at...